Our Capabilities
Phase I Environmental Site Assessments (Phase I ESA) According to ASTM E 1527-21 and ASTM E 2247-16 (to Comply with the All Appropriate Inquiry AAI Rule)
- Transaction Screen Process (TSP) Using Prevailing ASTM Standard
Trained to Perform Vapor Intrusion Screening per ASTM Standard E 2600-22
Phase II Environmental Site Assessments Following Up on Phase I Environmental Site Assessment Findings Following Limited Scope or per ASTM Standard E 1903-19 or Equivalent
Full-Color Phase I Environmental Site Assessment Report Delivery in PDF via Document Service, e.g. Dropbox
- Complicated In-Depth Historical Research and Investigation for Report Background
- ISRA Compliance Documentation and Phase I Environmental Site Assessments in New Jersey
- Phase I Environmental Site Assessment Peer Reviews for In-House Underwriting Groups
- After-Report Consultation Services with Closing Parties and Regulators
- Subsequent Phases (i.e. Phase II ESA) of Environmental Site and Contamination Assessments Involving Soil and Groundwater Contamination Studies
Surface Water and Groundwater Quality Sampling and Chemical Testing, Including Primary and Secondary Drinking Water Standards, Radionuclides, Bacteria, and Typical Field-Tested Parameters; Trophic State Index; Sampling, Interpretation and Reporting of Results According to FDEP SOPs and Rules
- Underground and Aboveground Storage Tank (UST and AST) Site Investigations and Evaluations, and Closure Assessments
- Coordination of UST and AST Removal, and “Excess” Soil Contamination Removal and Disposal at Permitted Facilities
- Petroleum Product and Solvent Soil Contamination Assessment, Excavation and Removal
- Geotechnical, Chemical Testing and Project Monitoring Services for Development of Sites with Arsenic or Radon-Impacted Soils
- Groundwater Remediation via Pumping, On-Site Chemical or Carbon Treatment, Air Sparging, Vacuum Extraction and/or Bio-Augmentation
- Site Assessment Reports (SAR) (Chapter 62-780 F.A.C.)
- Groundwater Monitoring Well Construction, Permitting, Well Development, Well Bailing and Sampling, and Well Abandonment
- Drilling Using In-House Track-Mounted and Truck-Mounted Drill Rigs (MEI) and “Direct Push” Technology Using Qualified Subcontractors
- Aquifer System Pump and Performance Testing, and Permeability Testing
- Groundwater Recovery Well Construction, Permitting, Well Development, Pump Placement and Operation; Sparge and Vent Well Construction
- Field Soil Sample and Well/Borehole Headspace Organic Vapor Analysis Testing with a Porta-FID II OVA Meter or Similar
- Deep and Shallow Test Borings (Augers or SPT Borings)
- Test Pits with Backhoe
- GPR Studies for Buried Tanks, Drums, Pipelines, Debris, etc. (MEI)
- Soil Radon Testing (Radium 226 Testing) and Soil Radon Mitigation
- Asbestos, Indoor Radon Gas, and Lead-Based Paint Testing Through Trusted Sub-Consultants